LOTO & Electrical Safety
TRN-1042 In progressLockout/tagout procedure for the floor-2 distribution board, including static bypass switching and verification of zero energy state.
33%
1 of 3 steps complete
Both trainee and approver must sign to close this out.
01
Permits Module Implementation Plan.pdf
PDF · 12 pages · opened Aug 13, 4:25 PM
02
Bypass walkthrough — floor 2 UPS
MP4 · 6m 12s · not started
03
Vendor maintenance portal
eaton.com/support/ups · not started
Messages
Visible to Dana Alvarez, the buddy, and the approver.
Aug 12
DA
Dana Alvarez
Trainee
9:40 AM
Quick one — the SOP lists three isolation points but the board only has two labelled. Which one am I missing?
MO
Morgan Okafor
Assigned by
10:02 AM
@Dana the third is behind the access panel on the left — it isn't labelled yet. Photo attached, I've raised a ticket for the label.
board-left-panel.jpg
Today
Dana completed step 1 · 4:26 PM
DA
Dana Alvarez
Trainee
4:28 PM
Got it, thanks. Plan read end to end. I'll do the walkthrough video tomorrow morning before the shift.